              Chinese Version
              Current position: Home page - Technical superiority - Contracting and PMC for LDPE plant
              Contracting and PMC for LDPE plant

              QPEC successively undertook supervision for many LDPE plants of Maoming Petrochemical Co., Qilu Petrochemical Co., Yanshan Petrochemical Co., and Daqing Petrochemical Co and so on.

              Maoming 100,000T/Y LDPE Plant was imported as package which was at that time the biggest plant in productive capacity per unit at home and whose commissioning was successful once through in 1996. The basic engineering design and the detailed engineering design of the high pressure section for Qilu 140,000T/Y LDPE Plant was carried out by Tecnimont Co. of Italy and the commissioning was successful once through in 1998. This plant was awarded Silver Prize of National Premium Projects in 2003. Yanshan 200,000T/Y LDPE Plant adopted Exxon technical Know-how of USA and was completed in 2001. This plant was praised to be "Model Project" by Sinopec. Maoming 250,000T/Y LDPE Plant was commissioning successful once through in 2007 and it won Premium Projects by Sinopec.

              QPEC undertook all the detailed engineering design for Qilu LDPE Plant except that of the high pressure section. We had very good cooperation with Tecnimont Co. of Italy, from which we acquired more profound comprehension and cognition in the difficulties, the essentials and the key-points of construction.